Leica Tcr805 Total Station User Manual Work ((exclusive)) [ 2024 ]
Mastering the Leica TCR805 Total Station: A Comprehensive Guide to User Manual Work
Keywords: Leica TCR805 total station user manual work, surveying setup, EDM calibration, data recording
Manual Settings for Transfer:
- Telescope: 30x magnification with a focusing ring.
- Vertical/Horizontal Tangent Screws: For fine adjustments.
- Electronic Level: Displayed on the LCD for precise leveling.
- Battery Compartment: Holds the GEB111 or GEB121 battery.
- Data Ports: RS232 serial interface for data transfer.
- Job Manager: Before shooting any points, you must create or select a Job. This ensures all data is stored in the correct file (GSI format).
- Point Manager: Used to view, edit, or delete stored coordinates.
- Code Manager: Allows you to select feature codes (e.g., "FENCE", "TREE") to attach to measured points for post-processing.
Step 3: Leveling the Instrument (The Manual's 3-Screw Method)
- Rotate the alidade so the plate level is parallel to two leveling screws.
- Turn both screws in opposite directions to center the bubble.
- Rotate the instrument 90° (grad) and use the third screw to center the bubble.
- Repeat until the bubble remains centered in all orientations.
- Finally, check the circular level (horseshoe level) on the tribrach. If off, adjust using the hex key as shown on page 2-8 of the manual.
- Manual step: Enter Point 1 Northing/Easting. Enter Point 2. Press
INV. It displays: "Azimuth = 124°32'15", HD = 45.678m".
Part 6: The "Work" of Data Management
User manual work isn't just about field operations—it's about data flow. leica tcr805 total station user manual work
Part 4: The "R" in TCR805 – Mastering Reflectorless Measurement
This is where the manual is non-negotiable. Reflectorless mode is powerful but dangerous for data quality. Mastering the Leica TCR805 Total Station: A Comprehensive
