Introduction to Construction Estimates
What is a Construction Estimate?
- Define scope briefly but clearly: single-sentence summary plus bullet list of included items.
- Break scope into major trade sections.
- For each trade, list line items with unit, quantity, unit cost, and total.
- Sum sub-totals by trade, then aggregate.
- Add markups, overhead, profit, and contingency as separate lines.
- Footnote assumptions and exclusions.
- Provide a simple revision log space for change orders.
Do that, and you won’t just be reading a book—you’ll be building a career. Simplified Construction Estimate Max Fajardo.pdf
Step-by-Step Approach:
Each chapter follows a clear pattern:
→ Description of material
→ Common formulas (e.g., number of CHB = Area × 12.5)
→ Sample problems with solutions
→ Worksheets for practice Do that, and you won’t just be reading
Introduction
- Mason – 2–3 sqm CHB laying
- Carpenter – 5 sqm formworks
- Plasterer – 8 sqm plastering
- Painter – 15 sqm painting (1 coat)